Home > Press Releases > 2006 > Kobe Steel to start Indonesian trial project to upgrade brown coal into high-rank coal
Press Releases
The information on this Web site is presented "as is." Product availability, organization, and other content may differ from the time the information was originally posted. Changes may take place without notice.
Kobe Steel to start Indonesian trial project to upgrade brown coal into high-rank coal
Project to be carried out under the Japan Coal Energy Center
July 5, 2006
TOKYO, July 5, 2006 - Kobe Steel, Ltd. announces that it will start a large-scale
demonstration project in Indonesia to upgrade brown coal into high-rank coal,
which can be used for power generation. Although Indonesia has an abundance
of brown coal, the high moisture content makes utilization of this natural resource
difficult.
In starting the project, Kobe Steel signed cooperation agreements with natural
resources investment company PT. Bumi Resources Tbk and its subsidiary, PT.
Arutmin Indonesia, to construct and operate a demonstration plant at Arutmin's
Satui mine in southern Kalimantan, Indonesia. Total investments in the demonstration
project are forecast to reach about 8 billion yen (approximately US$70 million).
Plans call for the construction of the 600-ton-per-day demonstration plant to
start in late 2006. From second-quarter 2008, trial production of Upgraded Brown
Coal (or UBC) will begin. Bulk samples of UBC will be supplied for trial use
to a number of power companies, including Japanese power companies. The trial
operation is to continue for two years, to first-quarter 2010. Following the
demonstration phase, a commercial plant is anticipated to be built in 2010.
The UBC demonstration plant project has the support of Japan's Ministry of Economy
Trade and Industry through the Japan Coal Energy Center, in which Kobe Steel
is a member. With its long experience in the steel industry and know-how in
the power generation business, Kobe Steel will contribute its technological
expertise in energy utilization and environmental technologies to the UBC demonstration
project.
Coal meets one-fourth of the world's energy demand. It is the second-most important
resource after oil. Over 20% of the electricity for everyday use in Japan is
made by coal-fired power generation. Japan is dependent on overseas energy supplies.
Coal is more abundant than oil and gas in terms of volume, and reserves are
spread throughout the world. A stable source of energy, coal is expected to
play an important role in the future.
The variety of coal used by many countries, including Japan, is high-rank bituminous
coal. Conversely, a representative low-rank coal is brown coal. Low-rank coal,
comprising about half of the world's coal reserves, has a high moisture content
and low heat value. It is also prone to spontaneous combustion. These factors
make it difficult to utilize. On the other hand, Indonesian brown coal is noted
for its low sulfur and ash content, as well as for its large reserves. Roughly
85% of the coal reserves in Indonesia consist of low-rank coal.
Kobe Steel has been involved in coal utilization research for many years. Starting
in 1980, Kobe Steel participated in a national project to develop brown coal
liquefaction, a coal-to-oil technology. The UBC Process currently under development
uses dewatering technology to reduce the moisture in the brown coal. This innovative
five-step process uses light oil to efficiently remove the water in the brown
coal.
Upgraded Brown Coal Process
1. | Low-rank coal is pulverized. |
2. | The pulverized coal is mixed with recycled oil (normally petroleum light oil) and heavy oil to make slurry. |
3. | The slurry is then heated in an evaporator and the moisture is evaporated. |
4. | The oil is recovered from the dewatered slurry using a decanter. At this stage, the upgraded coal is still in a powdery state. |
5. | The upgraded coal is briquetted for easy transportation. |
Kobe Steel began development of the UBC Process in 1993, applying slurry dewatering technology used in coal liquefaction to upgrade low-rank coal. Using a 100-kg-per-day bench-scale unit built at Kakogawa Works, Kobe Steel began working on the practical application of the process in the mid-1990s. In 2001, Japan and Indonesia adopted the UBC Process as a national project. In the years to 2004, a 3-ton-per-day pilot plant was constructed and operated in Indonesia.
The new, scaled-up demonstration plant provides the next major step to realizing a commercial UBC plant. The UBC Process raises the heat value of brown coal 1.5 times, to the same level as high-rank bituminous coal and has only one-third the ash. At the same time, it solves the problem of shipping and storage limitations, making possible the utilization of upgraded coal as a substitute for high-rank coal. UBC has the potential of becoming a clean, outstanding source of energy. Both Indonesia and Japan have high expectations for the early commercialization of the UBC Process.
Background Information
Japan Coal Energy Center (JCOAL) | |
The Japan Coal Energy Center is a non-profit
organization under Japan's Ministry of Ministry of Economy Trade and Industry.
Its activities cover all aspects of coal, from coal mining to coal utilization.
JCOAL promotes increasing the world coal supply and environment friendly
coal utilization to reduce the global environment burden. To contribute
to the stable supply of energy and sound growth of the industrial economy,
JCOAL undertakes coal research, business support, human resources development,
coal surveys and coal research. More information is available at:
www.jcoal.or.jp/index-en.html
|
PT. Bumi Resources Tbk | |
PT Bumi Resources Tbk is involved in coal mining and oil exploration. Based in Jakarta, Indonesia, Bumi was established in 1973. In 2005, the company produced a total of 36 million metric tons of coal. More information is available at: www.bumiresources.com |
Besides Arutmin Indonesia, Bumi Resources conducts coal-mining operations through PT. Kaltim Prima Coal. In 2005, Kaltim Prima Coal produced 21.4 million metric tons of coal.
PT. Arutmin Indonesia | |
PT. Arutmin Indonesia is Indonesia's fourth largest coal company, producing 14.6 million metric tons in 2005. Arutmin Indonesia is based in Kalimantan, Indonesia. More information is available at: More information is available at: www.arutmin.com |
Kobe Steel, Ltd. | |
Kobe Steel, Ltd. is one of Japan's leading
steelmakers and producers of aluminum and copper products. Other businesses
include welding consumables, industrial machinery, engineering, construction
equipment, and electronic materials. More information is available at:
www.kobelco.co.jp
|